Mike and our contractor have been busy working on this load-bearing wall that was once on the exterior. Mike completely removed all of the old wood siding, I thought at first about keeping it for possible projects but the wood was just not reusable, way too dry. The bracing that you see is to help support the floor joists while they installed the engineered header, which allows us to completely remove this load-bearing wall!

Below is a picture of the engineered beam they installed. It arrived a few days before it was installed. It took about 5 or 6 people to lift it and bring it in the house. But, thankfully the day it was installed, our contractor devised a way to help brace it while they lifted it up towards the ceiling (see the "ladder" he made)

Below is a view looking through the old exterior wall into the living room.

Installing the beam, our contractor and his son-in-law.

Close-up of the beam.

Studs were removed once the beam was installed. Don't the windows look great?!

Below is the view from our front door looking into the living room. Mike started removing some of the old "drywall" material that was there, it was really thin. The green is the original beadboard that was behind this drywall. We are trying to decide what to do, there are a few places where there is water damage on the beadboard, so we may have to drywall over it or at least partially.

Lili and I came by today to see the progress, it was extremely dusty. The floorplan is already much more spacious feeling and open! Where I'm standing will be part of the kitchen. The wall in the foreground seperates the living area from the kitchen/dining area.

Still more to come, Mike has been working on the living room celing today, hope to have pics soon!